help !
1 The marketing approach that usually has long lead
times for highly customized products is known as
____________________.
Question 1 options:
A Make-to-stock
B Make-to-order
C Engineer-to-order
D Assemble-to-order
2 The service factory sector typically requires low
labor costs, low customization ability, and minimal customer
interaction. The following are examples of service factory
organizations, except ____________________.
Question 2 options:
A Trucking companies
B Hotels
C Automobile repair shops
D Airlines
3 The Malcolm Baldrige Quality Award is a national award
recognizing organizations who have demonstrated superior excellence
in ____________________.
Question 3 options:
|
Engineering and design |
|
|
Production and service |
|
|
Shipping and receiving |
|
|
Quality and performance |
4 The service sector characterized by high
customization, high customer interaction, and high costs is
___________ .
Question 4 options:
Professional service
Mass service
Service shop
Service factory
5 An auto repair shop most likely falls into which of
the following service sectors?
Question 5 options:
Customer service
Mass service
Quick-turn service
Service shop
6 Which marketing approach would a company use to mass
produce products?
Question 6 options:
Make-to-order
Make-to-stock
Engineer-to-order
Make-for-stockouts
7 Manufacturing operations outputs differ from service
operations in that ____________.
Question 7 options:
Manufacturing outputs have to be repetitive
Service outputs are a result of long-term planning
Manufacturing outputs are tangible
Service outputs are highly customized
8 Total Quality Management (TQM) is defined as
_________________.
Question 8 options:
Designing processes to produce consistent quality
Inspectors hired to check quality
A process to repair poor-quality products
An element not necessary for providing services
9 Manufacturing process activities to produce a given
product are often summarized on a ________________.
Question 9 options:
Product matrix
Inventory plan
Manufacturing routing
Quality improvement plan
10 A bill of material (BOM) is a document used to
_________________.
Question 10 options:
Obtain a Malcolm Baldrige Quality Award
Provide a comprehensive listing of parts and components required
to manufacture a given product
Advertise a product to consumers
Promote sales